Suspended ceiling systemsMF suspended ceilingsOffice partitioningFloor coveringsRaised access flooringMezzanine floorsElectrical installationsSpace planningGlazingPlumbingDecorationHeating and ventilationMetal stud partitioningPartitioningJumbo stud partitioningIndustrial partitioningDrywall and drylining systems
B
Phase One Automated Pathology Laboratory
BKS were contracted by the NHS to determine and install a suspended ceiling and lighting system to suit the nature of the laboratory. The laboratory is fully functional 24hrs a day and access to the ceiling area was complicated due to the nature of the room and machinery in constant use. Evidently we knew that the installation would be a challenge for BKS Construction with limited work space and by having to constantly work over multi million pound machinery and pathologists. Working hours were from 6pm til 6am because at this time less medical staff were working. The system used was an anti corrosive grid with a Rockfon Medicare plus tile which provided all the properties required for this particular type of laboratory.
Phase Two Main tower circulation and ward entrance area
Phase two at the hospital required the removal of the existing metal pan ceiling in preparation for the new Rockfon Medi Care ceiling system. In addition to the ceiling installation a new lighting system was installed.
You are viewing the text version of this site.
To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.
Need help? check the requirements page.